The large bearing at the South end of the main polar shaft of the 26m radio telescope failed on 2008 October 03. Observing was immediately shut down to prevent further damage. After extensive engineering investigation and consultation, the decision was taken to repair the telescope - the only one of its type in Africa. The photographs below summarise how this was accomplished.

Prime contractors for the repair were General Dynamics Satcom Technologies in the United States. Local contractors were Stratosat Datacom, and the local engineering subcontractor was Tass Engineering.

polar shaft
Left click on image for large version.
Schematic diagram of an antenna similar to the HartRAO 26m telescope, showing the polar shaft (NASA). The failed bearing was at the upper end of the polar shaft.

Slab
Left click on image for large version.
2010-03-09 Cutting the concrete slab and removing the old airconditioning chiller foundation in preparation for casting the concrete supports for the box beam and A-frame that will hold up the 200 tonne telescope during the bearing replacement

soil
Left click on image for large version.
2010-04-09 Testing the soil hardness to ensure it will properly support 200 tonnes.

2010-04-19 Pouring concrete
Left click on image for large version.
2010-04-19 Pouring concrete

2010-05-14_concrete_curing_in_the_mist
Left click on image for large version.
2010-05-14 Concrete curing in the mist

2010-05-26_box_girder+parts
Left click on image for large version.
2010-05-26 Box girder parts constructed at Tass Engineering. The large box beam will support an A-frame (bipod) that will be attached to the polar shaft just behind the failed bearing.

2010-05-27_Ludwig_surveying_26m_polar_shaft
Left click on image for large version.
2010-05-27 HartRAO Associate Director for Space Geodesy Ludwig Combrinck surveying the 26m polar shaft before work begins, to determine its shift during the repair

2010-06-10_placing_box_beam
Left click on image for large version.
2010-06-10 Placing the box beam on the concrete pads

2010-06-15_bearing_puller
Left click on image for large version.
2010-06-15 The red polar shaft end cap puller is in place. The bearing is behind the end cap. Spot the person in the structure!

2010-06-18_polar_shaft_collar+A-frame_top_pivot
Left click on image for large version.
2010-06-18 Polar shaft collar and A-frame top pivot have been installed on the polar shaft just behind the bearing. Viewed from the west side.

2010-06-22_East_A-frame_upper_leg_installed
Left click on image for large version.
2010-06-22 The A-frame upper legs have been installed. At this stage the two upper legs hang from the collar around the polar shaft.

2010-06-23_HA_gearwheel_bracing_and_scaffolding_05888
Left click on image for large version.
2010-06-23 The large gear wheel for driving East-West Hour had to be braced with temporary struts to prevent it moving during the repair

2010-06-24_East_bipod_leg_lift
Left click on image for large version.
2010-06-24 Lifting the lower East A-frame leg into position. The lower West leg is already in place.

2010-06-24_inserting_pivot_pin_East_bipod_leg
Left click on image for large version.
2010-06-24 Inserting the pivot pin in the East A-frame leg to lock it in place

2010-06-28_A-frame_work
Left click on image for large version.
2010-06-28 Working on the A-frame

2010-06-30_first_lift-east_jack
Left click on image for large version.
2010-06-30 First lift of the East A-frame leg using a 200 tonne hydraulic jack. The polar shaft had sagged as the bearing failed, and had to be moved back into the correct position to replace the bearing.

2010-07-01_end_cap_puller_and_splice_plate_removal
Left click on image for large version.
2010-07-01 The red puller is in place for removing the end cap. The bolts holding the splice plates between the end cap and support legs are being removed. The 200 tonne antenna is now supported on the A-frame.

2010-07-01_bearing_cover_removal_with_jack_inside_puller
Left click on image for large version.
2010-07-01 Bearing cover removal with jack inside puller

2010-07-01_bolts_that_used_to_hold_the_telescope_together
Left click on image for large version.
2010-07-01 Bolts that used to hold the telescope together

2010-07-02_polar_shaft_end_cap_is_off
Left click on image for large version.
2010-07-02 The polar shaft South end cap is off! 200 tons of force was required from the hydraulic jack to shift it, after 49 years in place.

2010-07-02_south_polar_shaft_bearing_exposed
Left click on image for large version.
2010-07-02 The south polar shaft bearing exposed. Fragments of broken bearing fall out.

2010-07-02_extracting_rollers_from_damaged_inner_race
Left click on image for large version.
2010-07-02 Extracting rollers from the damaged inner race of the south bearing.

2010-07-06_arc_gouging_in_action_1634.jpg
Left click on image for large version.
2010-07-06 Arc gouging being used to cut through inner bearings to get them out.

2010-07-13_Andrew_preparing_endcap
Left click on image for large version.
2010-07-13 HartRAO antenna technician Andrew Masiteng preparing the polar shaft end cap for re-installation

2010-07-14_1000_bearing_pusher_installation
Left click on image for large version.
2010-07-14 The new bearing is on the end of the shaft and the pusher is being installed

2010-07-14_1010_bearing_preparing_for_push
Left click on image for large version.
2010-07-14 Preparing to push the new bearing onto the shaft. Heating and cooling (with liquid nitrogen) was used to cause differential expansion and provide sufficient clearance to push the new bearing into place.

2010-07-15_the_bearing_is_in
Left click on image for large version.
2010-07-15 The new bearing is in!

2010-07-14_1044_bearing_in_and_Pieter_happy
Left click on image for large version.
2010-07-14 HartRAO antenna specialist Pieter Stronkhorst is happy.

2010-07-15_06144_end-cap_approaches_polar_shaft
Left click on image for large version.
2010-07-15 The end cap is brought to the polar shaft for refitting

2010-07-16_A-frame_removal
Left click on image for large version.
2010-07-16 The end cap is on, the splice plates have been bolted back on to rejoin the end cap to the support legs, and the A-frame is being removed.

2010-07-20_Hart26m_telescope_drives_with_new_bearing
Left click on image for large version.
2010-07-20 The HartRAO 26m telescope drives for the first time with new bearing, closely watched by technical staff

2010-07-22_first_observation_log
Left click on image for large version.
2010-07-22 Exactly one year after the decision by the President of the NRF to repair the telescope, the first observation was carried out successfully. The observing log is shown; the observation was to begin the process the establishing a new pointing model for the telescope.

2010-07-22_first_observation_plot
Left click on image for large version.
2010-07-22 Plot of the scans across radio galaxy 1253-05 in the first observation after the repair. Multiple scans are plotted superimposed, as the observing programme iteratively finds the pointing errors in this direction. This receiver has two feeds alongside each other collecting the signal. The software takes the difference between the two signals. This causes the apparent "positive" and "negative" radio sources in the scans - they are actually from the same object. The upper plot shows left-circular polarization data, the lower plot righ-circular polarization. The are recorded separately by the receiver.

2010-07-22_testing_the_west_limit
Left click on image for large version.
2010-07-22 Testing the West limit switches that prevent the antenna from driving off the end of the gearwheel

2010-07-23_Hart26m+XDM_both_observing_Vela_pulsar
Left click on image for large version.
2010-07-23 The process of recommissioning all the receivers and data capture system for different observing modes continued. Here the HartRAO 26m telescope and the 15m XDM prototype for the Karoo Array Telescope are both observing the Vela pulsar. This collapsed star undergoes sudden jumps in its rotation rate, called 'glitches', every few years. After a wait of four years, it glitched a few days after observing resumed with the 26m telescope.

2010-07-28_Marisa_preparing_for_VLBIs
Left click on image for large version.
2010-07-28 A big milestone was resuming VLBI observing, working together with radio telescopes on other continents. Here Marisa Nickola prepares for the first VLBI.

The first post-repair VLBI was a 24-hour astrometric experiment named CRF60. It was undertaken on 2010 August 11. In this experiment the (ex-NASA) HartRAO 26m telescope combined with the University of Tasmania 26m telescope (also ex-NASA) at Mount Pleasant near Hobart and NASA's DSS-45 34m antenna at Tidbinbilla near Canberra. CRF60 is one of a continuing series astrometric VLBIs run by the International VLBI Service for Astrometry and Geodesy (IVS) aimed at establishing, maintaining and improving the International Celestial Reference Frame in the Southern Hemisphere. The ICRF provides the framework for astronomers to accurately locate other celestial objects.

A timelapse movie of the repaired telescope in action can be seen here, courtesy of "Carolune".